party-mass constructionPARTY BUILDING

14

2022

-

10

Public Participation in the Second Information Publicity of Environmental Impact Assessment of Qiaojiawa River Comprehensive Treatment Project


In accordance with the relevant requirements of the "Measures for Public Participation in Environmental Impact Assessment", the draft of the "Environmental Impact Report of the Qiaojiawa River Comprehensive Treatment Project" is now published to the public for soliciting public opinions and accepting public supervision.

Basic Information of 1. Project

(1) Project name: Qiaojiawa River Comprehensive Treatment Project

(2) Construction site: south of Qiaojiawa Road, north of Longmen Road, east of Sansha Road and west of Haijun Road in West Coast New District of Qingdao City

(3) Construction unit: Qingdao Military-civilian Integration Development Group Co., Ltd.

(4) Project and investment scale: This project is located in the start-up area of the Guzhenkou Military-civilian Integration Demonstration Zone in the West Coast New District of Qingdao City. Combined with the planning and layout of the area, it is not limited to traditional flood control projects. Under the premise of ensuring water safety, it takes into account water environment management, Water ecological restoration, water resources development and utilization, and comprehensive river management are implemented. The construction content of this project mainly includes water conservancy engineering, landscape engineering, water supply and drainage engineering, supporting construction engineering, electrical lighting engineering, etc. The treatment length of this project is about 1.05km, the total land area is 96772.44 m2, the land area is 71277.06 m2, the water area within the blue line of the river is 25495.38 m2, the green area is 50837.3 m2, and the greening rate is 71.3. The total investment of the project is 74.062 million yuan and the construction period is 10 months.

Introduction to 2. Project

During the construction period, the main water pollutants are domestic sewage, concrete curing wastewater, mortar mixing and cleaning wastewater, vehicle machinery flushing wastewater and construction drainage; the waste gas mainly includes dust caused by unloading of earthwork transportation vehicles and secondary dust, dust caused by stacking of lime, sand and other building materials, transportation dust generated by construction vehicles entering and leaving the construction site, and exhaust gas generated by construction machinery and transportation vehicles; the noise is mainly generated by the operation of construction machinery and transport vehicles; the solid waste is mainly domestic waste generated by construction personnel and construction waste generated by construction.

During the operation period, the main water pollutants are the domestic sewage of the park maintenance and management staff and the domestic sewage generated by tourists. The atmospheric environmental impact is mainly the exhaust gas generated by passenger vehicles entering the site. The acoustic environmental impact is mainly the noise generated by the vehicles driving and whistling of visiting tourists. The solid waste mainly comes from the domestic garbage generated by the staff and visiting tourists.

Pollution prevention and control measures are taken during the construction and operation periods of the project, and the construction, construction and operation of the project have little impact on the surrounding environment and sensitive targets.

Network links to the full text of the draft 3. EIA report and ways and means of accessing the paper report:

(1) Full-text connection of the draft environmental impact assessment report for comments: https://pan.baidu.com/s/1JJmMMYNj6_g5mOjXHGmHcw?pwd=yxg8;

(2) Ways and means of consulting paper reports: Qingdao Military-civilian Integration Development Group Co., Ltd.

Public Scope of 4. Consultation

Citizens, legal persons and other organizations within the scope of environmental impact assessment.

Web link to 5. public comment form

Web link to the public comment form for this project: http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html 。

Ways and means of 6. public input

Public opinions can be downloaded and filled in the public opinion form to be fed back to the construction unit through telephone, fax, e-mail and other contact methods.

Start and end time for 7. public comments

Within 10 working days from the date of this public announcement.

8. contact information

Name of Construction Unit: Qingdao Military-civilian Integration Development Group Co., Ltd.

Contact: Feng Chunyu

Contact information: 0532-85160055

Address: 388 Wheel Mountain Road, West Coast New District, Qingdao

Qingdao Military and Civilian Integration Development Group Co., Ltd.

October 14, 2022

WeChat platform two-dimensional code

Mobile phone version of the two-dimensional code

Company address: 388 Wheel Mountain Road, West Coast New District, Qingdao, China

Contact Phone:0532-85160055

Email:qdrfjtzhb@126.com

Website record number: Lu ICP Bei 16050788 No. -2

Website Construction: Power of Chinese Enterprises Qingdao SEO Business License